Capital Investment
In case of polyhouse designing and
construction for an acre of area following capital investment is required.
Framework
Framework
Wooden plank
G.I. wire
|
15,00,000
25,00,000
35,000 |
2. Covering
Plastic sheet
Nylon net 80 mesh/white |
28,00,000
12,00,000 |
- Cold storage chain
Cold storage structure
Exhaust fan
Fan (for circulation of air)
Aluminium network
|
8,00,000
4,20,000
2,03,000
1,00,000 |
4. Water management
structure Automatic
filtration
Sprinkler system
Drip irrigation system
Mechanism providing fertilizers along with water
|
5,00,000
25,000
25,000
2,62,000 |
5. Equipments Automatic operated
equipment
e.g. pH meter, water meter
Electric conductivity meter
|
10,00,000
30,000 |
6. Electric work |
15,00,000 |
- Installment
Framework,
film
Installing equipments
|
3,01,000
25,00,000 |
8. Building structure Land
development
Related to water management
Bore well, electric pump
Construction expenses
|
1,56,000
60,000
2,75,000
5,33,000 |
9. Other miscellaneous work
|
1,27,000 |
Total |
83,07,000 |
|
Ag.
Technologies
(Hi-Tech Agriculture)
|